Sk8MKD.com - Skateboarding in Macedonia


Do you own a scuba diving certification?
Yes.
No.
What?

Underwater photos - choice:


click to enlarge


click to enlarge

previous:
01, 02, 03, 04, 05, 06

(all photos made by scuba club KORALI, Macedonia)


Scuba eqiupment..
What do you need underwater?



Archive emails and messages from our visitors


Our scuba club on the shores of the Lake Ohrid


click for more



/
ARCHIVE.. (old texts) / SCUBA DOCTOR / U/W CLIPS / CONTACT




Medical advices
dr. K. Matov



KORALI

Read more about our scuba diving club KORALI



Sponsored links:

Advertisers, click here to get listed!

Kaneo Diving


KORALI
scuba diving club

The oldest scuba diving club in Macedonia

members and representatives of CMAS

< / >

4. INTERVENTION WORK ON SPECIFIC OCASSIONS

- Sanction work on the collector-system for the drainage of the dumping pit in the Zletovo mine (tunnel working conditions), Probistip, in 1994;

- Sanction work on the collector-system of the dumping pit in the Bucim mine (tunnel working conditions), in 1996;

- Sanction work on the collector system for the removal of barren soil, in the Bucim mine, in 1991;

- Probing work for the construction of an aeration channel at the Turija Dam, using breakage equipment (tunnel working conditions), in 1993;

- Sanction work on the silos in Ovcepole (working in elevated conditions), in 1987-1995;

- Impregnation work on the water tower of the water-pipeline in Kumanovo, in 1993;

- Cleaning work on the ceiling in the Themoelectrical plant Oslomej, working under conditions of high temperatures up to 200 C, transporting ashes (size, above 50m3), in 1990-96;

- Removal work of loose material (a result from different chemical processes), REK Bitola, horizontal transport, in 1994;

- Sanction work of apartment buildings in Skopje and Kumanovo (working in elevated conditions), GRO Mavrovo, the old TV building, in 1986;

- Sanction work on the cooling towers in the Thermoelectrical plant Oslomej (working in elevated positions, injection work), in 1989-1993;

- Entering into the collector-system of the dumping pit in the Bucim mine and location of the possible defect (working under extreme conditions), and getting the collector-system back in line, in 1999;

- Photographing work, on several occasions in the collector-system, from both sides, of the above mentioned mine, in 1999;

- Locating the defect on the Carina, Prespa pipeline, cleaning work of the horizontal single-acting piston and the pump suction line (working under extremely low temperatures), in 1997-99.

up




copyright © dive.xmkd.com 2003-2004
a division of XMKD.com