UNDERWATER CONSTRUCTION WORK
-
Building of the underwater section part of the Stenje
pier, for the requirements of JNA, in 1989;
- Building of the underwater section part of the
Radozda pier, in 1976;
- Building of the pier at the Autocamp Livadiste,
in 1980;
- Building underwater passages for telephone cables
across the rivers Vardar and Lepenec (total of 6
passages), for the requirements of JNA, in 1987-1990;
- Sanction work of the Town pier in Kotor, underwater
concreting activities, in 1987-89;
- Underwater reconstruction of synchronous elevators
in the overhauling office "Sava Kovacevic"
in Tivat, in 1991;
- Underwater construction work on a new dock and
sanction work on the old one in the shipyard Greben,
Vela Luka, in 1988;
- Sanction work of the Ohrid Town pier, in 1993-94;
- Sanction work on the foundations of the Tivat
pier by underwater injection-concreting work, in
1987;
- Underwater excavation work of loose soil at the
depth of 25-35m for the underwater collector-system
Tracte, in 1987;
- Manufacturing of specific equipment for underwater
activities;
- Manufacturing of a specific mud-pumping system
for the excavation of mud;
- Construction of recompression bar-chambers for
the requirements of The Institute of Submarine Medicine
of Split, Split Military Hospital, Ivan Milutinovic
Belgrade, Brodospas Split, Uljanik Rijeka;
- Equipment for underwater communication for the
requirements of URS Belgrade, Brodospas and Pomgrad
from Split;
- Underwater self-mobile camera for the requirements
of Brodospas from Split and Piran from Piran;
- Underwater injection-concreting equipment for
the requirements of the club for carrying out operations
in the Adriatic and sanction work on the piers in
Macedonia;
- Construction of equipment for underwater excavation
and transportation of loose material, for the club's
requirements;
- Construction of equipment for hydraulic transport
of loose material, in Budva, in 1990;
- Recompression bar-chambers for medical treatment,
for the requirements of various medical institutions;
|